| ConstructionSpace, a subsidiary of Foremans | Bovis Lend Lease Ltd | Date Assessment Undertaken | 12th Apr | Part 2 |
| Catfoss Lane, | Upper Brook Street | Date Assessment Reviewed | ||
| Brandesburton, Driffield, YO25 8EJ | Manchester | Date | 12th Apr | |
| Tel: 01964 544344 - Fax: 01964 542141 | Signed | P. Brown | ||
|
Code
|
List Hazards
|
Code
|
List groups of people at risk from identified hazards
|
Code
|
List existing controls or note where informantion may be found
|
Code
|
List risks not adequately controlled and action to be taken where practicable
|
| A) | Competency of employee / Contractor | A) | Employees - General public Contractor | A) | Induction to each employee/ contractor | A) | Re-training on a regular basis |
| B) | Incompetent use of cranes | B) | As Above | B) | As Above plus all employees trained by G.W.&S | B) | Nil |
| C) | General use of cranes | C) | As Above | C) | Routine inspection of crane / tackle and records | C) | Nil |
| D) | Installation Works | ||||||
| 1 | Falling objects from high level | 1 | As above - more so public | 1 | Safety induction to each employee / contractor | 1 | Regular tool box talks with employee / contactor & strict supervision of high level works |
| 2 | Working at height | 2 | Employee / contractor | 2 | As above and provision of protective clothing & equipment | 2 | Nil |
| 3 | Fire (from cutting / welding) | 3 | Employee / contractor / public | 3 | protective clothing & equipment provided & training in use of equipment | 3 | Nil |
| 4 | Craneage of heavy objects over public right of way | 4 | To All | 4 | Safety awareness training to employee and craneage training and protection to public I.e. road closure, protection and diverting pedestrians, use of tether lines supervising closure of pavements | 4 | Nil |
| 5 | General Accidents | 5 | To All | 5 | Each gang leader is equipped with first aid kit and received first aid training, accident book available to all sites | 5 | Nil |
| 6 | Use of plant equipment | 6 | To All | 6 | Use of competent trained staff and manufacturere guidelines C.I.T.B. trained staff for vehicles all plant equipment hired from known competent suppliers. | 6 | Nil |
| 7 | Use of compressed Air | 7 | Employee / Contractor | 7 | Use of competent trained staff compressor to be fitted with air fuses in case of burst, staff to wear protective clothing, compressors to be hired from known competent suppliers compressor to be sited on flat level ground, hoses to be checked for wear prior to use. | 7 | Nil |
| 8 | Use of Compressed Air Breaker | 8 | Employee / Contractor | 8 | Use of competent trained staff this equipment generates harmful noise levels, wear ear defenders, goggles & protective clothing, check condition of hoses before use. | 8 | Nil |
| E) | General Operations | ||||||
| 1 | Handling of heavy objects | 1 | Employee / Contractor | 1 | Staff induction and training in manual handling equipment and training given to objects of unreasonable size or weight | 1 | Nil |
| 2 | Handling of tools & equipment | 2 | As Above | 2 | All supplied tools / plant reguarly inspected and tested. 90% of equipment hired from competent supplier, equipment used in accordance with supplier guide-lines, any required protective clothing / equipment provided by company | 2 | Nil |
| 3 | Use of Ladders/Scaffolding | 3 | Employee / Contractor | 3 | Controlled by induction training & regular inspection on site. MEWP to be used by certified operator | 3 | Ladders only to be used in the event of an emergency |
| 4 | Housekeeping | 4 | As Above plus public visitors | 4 | Induction training and site inspections plus tool box talks | 4 | Dust problems within smaller areas employees / contractors provided with masks, goggles, gloves etc. ans advised to fully vent areas by opening windows or doors. Areas when possible, limited by use of sprinkled water prior to sweeping. Nails in timber: Controlled by regular cleaning and inspection and by regular tool boc talks with contractors |
| 5 | Handling of Glass | 5 | Employee / Contractor / Visitors | 5 | Induction / Training. Where necessary, competent experts commissioned to carry out works. | 5 | Nil |
| F) | Electricity | ||||||
| 1 | General Handling | 1 | Employees / Contractor / Visitors / Public | 1 | Always handled by known, competent contractors working in conjunction with company policies. | 1 | As Above |
| 2 | Disconnection of mains | 2 | Employees / Contractor | 2 | Nil | 2 | As Above |
| 3 | 3 | Employees / Contractor | 3 | Nil | 3 | Nil | |
| F) | Gas | ||||||
| 1 | As Electric | 1 | As Above | 1 | As Above | 1 | Nil |
| H) | Other Mains Services | ||||||
| 1 | General Handling | 1 | Employee / Contractor | 1 | Nil | 1 | Nil |
| I) | Control Of Harmful Substances | ||||||
| 1 | 1 | Employee / Contractor / Visitors / All | 1 | No materials are currently used which do not carry data sheets, no materials are used which require any protection over standard minimum requirments. | 1 |